Triple

T19899506
Position Surface form Disambiguated ID Type / Status
Subject Río Nazas E478244 entity
Predicate hasDam P8736 FINISHED
Object Presa Francisco Zarco NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Presa Francisco Zarco | Statement: [Río Nazas, hasDam, Presa Francisco Zarco]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Presa Francisco Zarco
Context triple: [Río Nazas, hasDam, Presa Francisco Zarco]
  • A. Presa Miguel Alemán
    Presa Miguel Alemán is a large hydroelectric and irrigation dam and reservoir located in the state of Oaxaca, Mexico.
  • B. Presa Palo Bolero
    Presa Palo Bolero is a reservoir located in the municipality of Puente de Ixtla in the Mexican state of Morelos, used primarily for irrigation and local water management.
  • C. Presa El Novillo
    Presa El Novillo is a major hydroelectric and irrigation dam located on the Yaqui River in the state of Sonora, Mexico.
  • D. Presa El Rodeo
    Presa El Rodeo is a reservoir located in the municipality of Puente de Ixtla in the Mexican state of Morelos, used primarily for irrigation, fishing, and local recreation.
  • E. Presa Lázaro Cárdenas chosen
    Presa Lázaro Cárdenas is a major Mexican dam and reservoir on the Nazas River, built primarily for irrigation, flood control, and regional water supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e520682081909892916424699bd5 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6593fbb348190afa7acf45af406ed completed April 20, 2026, 4:50 p.m.
Created at: April 10, 2026, 1:52 p.m.