Triple

T19899207
Position Surface form Disambiguated ID Type / Status
Subject Big Bend Dam E478235 entity
Predicate upstreamFrom P5955 FINISHED
Object Fort Randall Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fort Randall Dam | Statement: [Big Bend Dam, upstreamFrom, Fort Randall Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fort Randall Dam
Context triple: [Big Bend Dam, upstreamFrom, Fort Randall Dam]
  • A. Fort Randall Dam chosen
    Fort Randall Dam is a large U.S. Army Corps of Engineers hydroelectric and flood-control dam on the Missouri River in South Dakota, forming Lake Francis Case.
  • B. Rock Island Dam
    Rock Island Dam is a hydroelectric dam on the Columbia River in Washington State, notable as one of the first major dams built on the river for power generation and river control.
  • C. Saylorville Dam
    Saylorville Dam is a large flood-control and recreation dam on the Des Moines River in central Iowa, forming Saylorville Lake just upstream of Des Moines.
  • D. Lewisville Dam
    Lewisville Dam is an earthen embankment dam in North Texas that impounds the Elm Fork of the Trinity River to form Lewisville Lake for flood control, water supply, and recreation.
  • E. Cordell Hull Dam
    Cordell Hull Dam is a hydroelectric and flood-control dam on the Cumberland River in Tennessee, operated by the U.S. Army Corps of Engineers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e520682081909892916424699bd5 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6593fbb348190afa7acf45af406ed completed April 20, 2026, 4:50 p.m.
Created at: April 10, 2026, 1:52 p.m.