Triple

T19896491
Position Surface form Disambiguated ID Type / Status
Subject Basohli E478164 entity
Predicate hasAttraction P105 FINISHED
Object Basohli bridge over Ravi River NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Basohli bridge over Ravi River | Statement: [Basohli, hasAttraction, Basohli bridge over Ravi River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Basohli bridge over Ravi River
Context triple: [Basohli, hasAttraction, Basohli bridge over Ravi River]
  • A. Gujjar Nagar bridge
    Gujjar Nagar bridge is a key roadway bridge in Jammu, India, that connects the Gujjar Nagar area with other parts of the city across the Tawi River.
  • B. Chenab River bridge
    The Chenab River bridge is a historic railway bridge in Pakistan that spans the Chenab River near Wazirabad and is noted for its significant engineering and heritage value.
  • C. Aundh Bridge
    Aundh Bridge is a roadway bridge in Pune, India, that serves as a key connector across the Mula River between the Aundh area and surrounding localities.
  • D. Nehru Setu (Dehri-on-Sone rail bridge)
    Nehru Setu (Dehri-on-Sone rail bridge) is a major railway bridge in Bihar, India, carrying trains across the Son River and serving as an important link on the Grand Chord section of Indian Railways.
  • E. Chaderghat Bridge
    Chaderghat Bridge is a major road bridge in Hyderabad, India, that serves as an important connector across the Musi River within the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Basohli bridge over Ravi River
Target entity description: Basohli bridge over Ravi River is a cable-stayed bridge in Jammu and Kashmir, India, known for its distinctive architecture and for improving connectivity across the Ravi River near the town of Basohli.
  • A. Gujjar Nagar bridge
    Gujjar Nagar bridge is a key roadway bridge in Jammu, India, that connects the Gujjar Nagar area with other parts of the city across the Tawi River.
  • B. Chenab River bridge
    The Chenab River bridge is a historic railway bridge in Pakistan that spans the Chenab River near Wazirabad and is noted for its significant engineering and heritage value.
  • C. Aundh Bridge
    Aundh Bridge is a roadway bridge in Pune, India, that serves as a key connector across the Mula River between the Aundh area and surrounding localities.
  • D. Nehru Setu (Dehri-on-Sone rail bridge)
    Nehru Setu (Dehri-on-Sone rail bridge) is a major railway bridge in Bihar, India, carrying trains across the Son River and serving as an important link on the Grand Chord section of Indian Railways.
  • E. Chaderghat Bridge
    Chaderghat Bridge is a major road bridge in Hyderabad, India, that serves as an important connector across the Musi River within the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e520682081909892916424699bd5 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6593dba78819082c8b80e65246171 completed April 20, 2026, 4:50 p.m.
Created at: April 10, 2026, 1:52 p.m.