Triple
T19887631
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Henvey Inlet First Nation |
E477942
|
entity |
| Predicate | windProjectCommissioning |
P103290
|
FINISHED |
| Object | around 2019 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: around 2019 | Statement: [Henvey Inlet First Nation, windProjectCommissioning, around 2019]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: windProjectCommissioning Context triple: [Henvey Inlet First Nation, windProjectCommissioning, around 2019]
-
A.
commissioningUpon
Indicates that one entity formally authorizes, initiates, or assigns another entity to begin a specific role, task, or project.
-
B.
windProcess
Indicates a process or action involving wind, such as its generation, movement, or effects on other entities.
-
C.
windResource
Indicates the availability, quality, or characteristics of wind at a location as a usable energy resource.
-
D.
expectedCommissioning
chosen
Indicates that an entity is anticipated or scheduled to be formally put into operation or service.
-
E.
constructionStatusAtCommissioning
Indicates the state or phase of construction an asset or structure was in at the time it was officially commissioned.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51f32b08190b3687f4f60353250 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e6590b12c08190bf44a3f3b2cb9122 |
completed | April 20, 2026, 4:49 p.m. |
| PD | Predicate disambiguation | batch_69e537e8c4e481909fe95d795b4864e7 |
completed | April 19, 2026, 8:15 p.m. |
Created at: April 10, 2026, 1:52 p.m.