Triple
T19875567
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shebaa Farms |
E477626
|
entity |
| Predicate | blueLineStatus |
P137667
|
FINISHED |
| Object | area left outside UN-certified Israeli withdrawal from Lebanon in 2000 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: area left outside UN-certified Israeli withdrawal from Lebanon in 2000 | Statement: [Shebaa Farms, blueLineStatus, area left outside UN-certified Israeli withdrawal from Lebanon in 2000]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: blueLineStatus Context triple: [Shebaa Farms, blueLineStatus, area left outside UN-certified Israeli withdrawal from Lebanon in 2000]
-
A.
followingStationOnBlueLine
Indicates that one station is the next consecutive stop after another station on the Blue Line route.
-
B.
railLineStatusAfterward
Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
-
C.
railStatus
Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
-
D.
subwayLine
Indicates that there is a subway line connection or service relationship between the referenced entities.
-
E.
railwayLineNow
Indicates that a previously existing railway line has been replaced, succeeded, or is currently represented by a new or different railway line.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51e7d948190aedbcd6c30361c39 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e658db058c8190b7bf0b003ead5bfc |
completed | April 20, 2026, 4:48 p.m. |
| PD | Predicate disambiguation | batch_69e537e8c4e481909fe95d795b4864e7 |
completed | April 19, 2026, 8:15 p.m. |
| PDg | Predicate description generation | batch_69e543c136b081909cab9394b958390a |
completed | April 19, 2026, 9:06 p.m. |
Created at: April 10, 2026, 1:52 p.m.