Triple
T19844302
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | John H. Kerr Reservoir |
E476817
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood control reservoir |
C20500
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood control reservoir Context triple: [John H. Kerr Reservoir, instanceOf, flood control reservoir]
-
A.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
B.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
C.
water reservoir complex
A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
-
D.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
-
E.
water reservoir
chosen
A water reservoir is a man-made or natural storage area designed to collect, hold, and regulate water for uses such as drinking supply, irrigation, flood control, and power generation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51d39d081909bcfafeaaf3d2fcc |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:51 p.m.