Triple

T1984377
Position Surface form Disambiguated ID Type / Status
Subject Alexander Lyman Holley E43105 entity
Predicate influencedBy P9 FINISHED
Object Henry Bessemer E2233 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Henry Bessemer | Statement: [Alexander Lyman Holley, influencedBy, Henry Bessemer]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Henry Bessemer
Context triple: [Alexander Lyman Holley, influencedBy, Henry Bessemer]
  • A. Henry Bessemer chosen
    Henry Bessemer was a 19th-century English inventor and engineer best known for developing the Bessemer process, which revolutionized mass steel production.
  • B. Anthony Bessemer
    Anthony Bessemer was a British engineer and inventor, best known as the father of Sir Henry Bessemer, who pioneered the Bessemer steelmaking process.
  • C. Henry Stephenson
    Henry Stephenson was a British character actor known for his dignified, often aristocratic roles in Hollywood films of the 1930s and 1940s.
  • D. Henry Royce
    Henry Royce was a pioneering British engineer and car designer best known for co-founding the luxury automobile and aero-engine manufacturer Rolls-Royce.
  • E. William Arrol
    William Arrol was a prominent Scottish civil engineer and bridge builder renowned for leading the construction of major late-19th-century steel structures, including iconic railway bridges in the United Kingdom.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88713ddc88190a969715658ebe7a8 completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abb820815481908aac6d89b437225b completed March 7, 2026, 5:31 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae03301a2481909f6147482d490b90 completed March 8, 2026, 11:16 p.m.
Created at: March 4, 2026, 7:37 p.m.