Triple

T19842361
Position Surface form Disambiguated ID Type / Status
Subject Kurpsai Reservoir E476766 entity
Predicate locatedUpstreamOf P5955 FINISHED
Object Tash-Kumyr Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tash-Kumyr Hydroelectric Power Plant | Statement: [Kurpsai Reservoir, locatedUpstreamOf, Tash-Kumyr Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tash-Kumyr Hydroelectric Power Plant
Context triple: [Kurpsai Reservoir, locatedUpstreamOf, Tash-Kumyr Hydroelectric Power Plant]
  • A. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • B. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • C. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • D. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tash-Kumyr Hydroelectric Power Plant
Target entity description: Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
  • A. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • B. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • C. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • D. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Baksan Hydroelectric Power Station
    The Baksan Hydroelectric Power Station is a hydroelectric facility in Russia’s Kabardino-Balkaria region that generates electricity using the flow of the Baksan River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51d39d081909bcfafeaaf3d2fcc completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65806375c8190a4f45f14aeb06515 completed April 20, 2026, 4:44 p.m.
Created at: April 10, 2026, 1:51 p.m.