Triple

T19824160
Position Surface form Disambiguated ID Type / Status
Subject Japanese battleship Tosa E476274 entity
Predicate constructionStatusAtCancellation P79985 FINISHED
Object nearly complete hull LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: nearly complete hull | Statement: [Japanese battleship Tosa, constructionStatusAtCancellation, nearly complete hull]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionStatusAtCancellation
Context triple: [Japanese battleship Tosa, constructionStatusAtCancellation, nearly complete hull]
  • A. constructionProgressAtCancellation chosen
    Indicates the level or stage of construction that had been reached at the time the project or contract was cancelled.
  • B. developmentPhaseAtCancellation
    Indicates the specific stage of development a project or product had reached at the time it was cancelled.
  • C. canceledAfter
    Indicates that one event or action was canceled at a point in time occurring after another specified event or action.
  • D. wasInitiallyCancelled
    Indicates that an event, action, or request was first cancelled at some point, regardless of its later status.
  • E. canceledBy
    Indicates that an action, event, or agreement was annulled or called off by a specific entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51c7c188190b926f3a2a7b5f881 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e655017c188190ae9e17ae6b0eee05 completed April 20, 2026, 4:32 p.m.
PD Predicate disambiguation batch_69e5305bda388190a23b7191768107b1 completed April 19, 2026, 7:43 p.m.
Created at: April 10, 2026, 1:50 p.m.