Triple

T19815183
Position Surface form Disambiguated ID Type / Status
Subject NH 9 E476041 entity
Predicate instanceOf P0 FINISHED
Object former Indian National Highway C21939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former Indian National Highway
Context triple: [NH 9, instanceOf, former Indian National Highway]
  • A. former national highway of India chosen
    A former national highway of India is a roadway that was once part of the country's officially designated national highway network but has since been renumbered, reclassified, or decommissioned from that status.
  • B. National Highway in India
    A National Highway in India is a major public roadway designated and maintained by the central government to connect key cities, ports, and regions across the country for efficient long-distance transportation.
  • C. National Highway of Pakistan
    A National Highway of Pakistan is a major federally administered road that forms part of the country’s primary intercity and interprovincial transport network, facilitating long-distance travel, trade, and connectivity between key urban and regional centers.
  • D. former state highway designation
    A former state highway designation is an official route number or name that was once assigned to a state-maintained roadway but has since been removed, reassigned, or decommissioned from the state highway system.
  • E. former road bypass
    A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51bc4208190a1c57d8c5d1b15e4 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:50 p.m.