Triple
T19814881
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NH 1 (northern section) |
E476034
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former national highway section |
C21939
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former national highway section Context triple: [NH 1 (northern section), instanceOf, former national highway section]
-
A.
former national highway of India
chosen
A former national highway of India is a roadway that was once part of the country's officially designated national highway network but has since been renumbered, reclassified, or decommissioned from that status.
-
B.
former state highway designation
A former state highway designation is an official route number or name that was once assigned to a state-maintained roadway but has since been removed, reassigned, or decommissioned from the state highway system.
-
C.
former road bypass
A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
-
D.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
E.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51bc4208190a1c57d8c5d1b15e4 |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:50 p.m.