Triple

T1981422
Position Surface form Disambiguated ID Type / Status
Subject Cablebús E43033 entity
Predicate instanceOf P0 FINISHED
Object aerial cable car system C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerial cable car system
Context triple: [Cablebús, instanceOf, aerial cable car system]
  • A. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. cable car pioneer
    A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
  • C. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • D. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • E. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88713ddc88190a969715658ebe7a8 completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:37 p.m.