Triple

T19810881
Position Surface form Disambiguated ID Type / Status
Subject White River Junction station E475939 entity
Predicate adjacentTo P224 FINISHED
Object New England Central Railroad yard NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New England Central Railroad yard | Statement: [White River Junction station, adjacentTo, New England Central Railroad yard]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New England Central Railroad yard
Context triple: [White River Junction station, adjacentTo, New England Central Railroad yard]
  • A. Watertown Yard
    Watertown Yard is a Massachusetts Bay Transportation Authority bus facility and former streetcar yard in Watertown, Massachusetts, serving as a key layover and terminal point for several bus routes.
  • B. Swampscott Railroad Depot
    Swampscott Railroad Depot is a historic former train station in Swampscott, Massachusetts, noted for its 19th-century architecture and role in the town’s rail transportation history.
  • C. Burlington rail yard
    Burlington rail yard is a freight and train storage facility in Burlington that supports rail operations near the city’s Amtrak station.
  • D. Boston and Albany Railroad station
    The Boston and Albany Railroad station was a historic rail facility that once served passengers and freight along the Boston–Albany route in Massachusetts and New York.
  • E. Salem Junction
    Salem Junction is a major railway station and transit hub in Salem, Tamil Nadu, connecting the city to numerous regional and long-distance rail routes across India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: New England Central Railroad yard
Target entity description: The New England Central Railroad yard is a rail facility in White River Junction, Vermont, used for assembling, storing, and managing freight trains and railroad equipment.
  • A. Watertown Yard
    Watertown Yard is a Massachusetts Bay Transportation Authority bus facility and former streetcar yard in Watertown, Massachusetts, serving as a key layover and terminal point for several bus routes.
  • B. Swampscott Railroad Depot
    Swampscott Railroad Depot is a historic former train station in Swampscott, Massachusetts, noted for its 19th-century architecture and role in the town’s rail transportation history.
  • C. Burlington rail yard
    Burlington rail yard is a freight and train storage facility in Burlington that supports rail operations near the city’s Amtrak station.
  • D. Boston and Albany Railroad station
    The Boston and Albany Railroad station was a historic rail facility that once served passengers and freight along the Boston–Albany route in Massachusetts and New York.
  • E. Salem Junction
    Salem Junction is a major railway station and transit hub in Salem, Tamil Nadu, connecting the city to numerous regional and long-distance rail routes across India.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51bc4208190a1c57d8c5d1b15e4 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6542bd7a48190acf67db41f1131c9 completed April 20, 2026, 4:28 p.m.
Created at: April 10, 2026, 1:50 p.m.