Triple

T19810845
Position Surface form Disambiguated ID Type / Status
Subject White River Junction station E475939 entity
Predicate railwayLineServed P848 FINISHED
Object New England Central Railroad main line NE NERFINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New England Central Railroad main line
Context triple: [White River Junction station, railwayLineServed, New England Central Railroad main line]
  • A. Boston and Maine Railroad main line
    The Boston and Maine Railroad main line was a major New England rail corridor that formed the core route of the Boston and Maine Railroad, connecting Boston with key cities and towns across northern Massachusetts and beyond.
  • B. New England Central Railroad chosen
    New England Central Railroad is a regional freight railroad operating primarily in New England, providing vital rail connections between local industries and the broader North American rail network.
  • C. Boston–Concord main line
    The Boston–Concord main line was a principal intercity rail corridor in New England that connected Boston, Massachusetts with Concord, New Hampshire, serving as a key route for the Boston and Maine Railroad.
  • D. Central New England Railway
    The Central New England Railway was a regional railroad that operated in the northeastern United States, primarily serving communities in New York and New England during the late 19th and early 20th centuries.
  • E. Fitchburg Line
    The Fitchburg Line is a commuter rail service operated by the Massachusetts Bay Transportation Authority (MBTA) that runs between Boston and the city of Fitchburg in Massachusetts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69d8e51bc4208190a1c57d8c5d1b15e4 elicitation completed
NER batch_69e6542bd7a48190acf67db41f1131c9 ner completed
Created at: April 10, 2026, 1:50 p.m.