Triple

T19799246
Position Surface form Disambiguated ID Type / Status
Subject Le Boulou E475625 entity
Predicate locatedOn P40 FINISHED
Object Tech River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tech River | Statement: [Le Boulou, locatedOn, Tech River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tech River
Context triple: [Le Boulou, locatedOn, Tech River]
  • A. Tech River chosen
    Tech River is a river in southern France that flows through the Pyrénées-Orientales department before emptying into the Mediterranean Sea.
  • B. Riverbed
    Riverbed is a large-scale immersive installation by artist Olafur Eliasson that transforms a gallery space into a rocky, river-like landscape, inviting viewers to experience a constructed natural environment indoors.
  • C. Pages River
    Pages River is a minor river in New South Wales, Australia, that forms part of the Hunter River catchment.
  • D. Ai River
    The Ai River is a tributary waterway that feeds into the Yalu River along the border region between China and North Korea.
  • E. Ai River
    The Ai River is a tributary waterway that feeds into the larger Ramu River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653c930a08190a2263db7170edd71 completed April 20, 2026, 4:26 p.m.
Created at: April 10, 2026, 1:49 p.m.