Triple

T19794832
Position Surface form Disambiguated ID Type / Status
Subject Poplar Bluff E475512 entity
Predicate hasTransportation P105 FINISHED
Object Missouri Route 53 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri Route 53 | Statement: [Poplar Bluff, hasTransportation, Missouri Route 53]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri Route 53
Context triple: [Poplar Bluff, hasTransportation, Missouri Route 53]
  • A. Missouri Route 52
    Missouri Route 52 is an east–west state highway in Missouri that runs across several counties, connecting rural communities and small towns in the central and western parts of the state.
  • B. Missouri Route 5
    Missouri Route 5 is a major north–south state highway in Missouri that traverses much of the state, connecting numerous rural communities and regional centers.
  • C. Missouri Route 36
    Missouri Route 36 is a major east–west highway across northern Missouri that serves as an important regional corridor connecting several key cities and linking to routes toward Kansas City and Illinois.
  • D. Missouri Route 39
    Missouri Route 39 is a state highway in southwestern Missouri that runs north–south through several rural counties, connecting small towns and local routes.
  • E. Missouri Route 43
    Missouri Route 43 is a north–south state highway in southwestern Missouri that runs through several counties, including Barton County, and connects rural communities to larger regional routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri Route 53
Target entity description: Missouri Route 53 is a state highway in southeastern Missouri that connects the city of Poplar Bluff with surrounding rural communities.
  • A. Missouri Route 52
    Missouri Route 52 is an east–west state highway in Missouri that runs across several counties, connecting rural communities and small towns in the central and western parts of the state.
  • B. Missouri Route 5
    Missouri Route 5 is a major north–south state highway in Missouri that traverses much of the state, connecting numerous rural communities and regional centers.
  • C. Missouri Route 36
    Missouri Route 36 is a major east–west highway across northern Missouri that serves as an important regional corridor connecting several key cities and linking to routes toward Kansas City and Illinois.
  • D. Missouri Route 39
    Missouri Route 39 is a state highway in southwestern Missouri that runs north–south through several rural counties, connecting small towns and local routes.
  • E. Missouri Route 43
    Missouri Route 43 is a north–south state highway in southwestern Missouri that runs through several counties, including Barton County, and connects rural communities to larger regional routes.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653c5a7d48190b2a384f768d13750 completed April 20, 2026, 4:26 p.m.
Created at: April 10, 2026, 1:49 p.m.