Triple

T19793691
Position Surface form Disambiguated ID Type / Status
Subject Toktogul Reservoir E475483 entity
Predicate partOf P40 FINISHED
Object Naryn cascade of hydropower plants NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Naryn cascade of hydropower plants | Statement: [Toktogul Reservoir, partOf, Naryn cascade of hydropower plants]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Naryn cascade of hydropower plants
Context triple: [Toktogul Reservoir, partOf, Naryn cascade of hydropower plants]
  • A. Nam Ou hydropower cascade
    The Nam Ou hydropower cascade is a series of large hydroelectric dams developed along Laos’s Nam Ou River to generate power and support regional energy infrastructure.
  • B. Pilmaiquén hydropower plants
    The Pilmaiquén hydropower plants are a group of hydroelectric facilities in southern Chile that generate renewable electricity by harnessing the flow of the Pilmaiquén River, a tributary of the Bueno River.
  • C. Dargai hydropower installations
    Dargai hydropower installations are a set of hydroelectric power stations in Pakistan that harness the flow of the Swat River to generate electricity for the surrounding region.
  • D. Laja River hydroelectric plants
    The Laja River hydroelectric plants are a group of power-generating facilities on Chile’s Laja River that play a key role in supplying electricity to the Biobío region.
  • E. Teesta hydropower cascade
    Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Naryn cascade of hydropower plants
Target entity description: The Naryn cascade of hydropower plants is a series of major hydroelectric power stations on the Naryn River in Kyrgyzstan that form the backbone of the country’s electricity generation system.
  • A. Nam Ou hydropower cascade
    The Nam Ou hydropower cascade is a series of large hydroelectric dams developed along Laos’s Nam Ou River to generate power and support regional energy infrastructure.
  • B. Pilmaiquén hydropower plants
    The Pilmaiquén hydropower plants are a group of hydroelectric facilities in southern Chile that generate renewable electricity by harnessing the flow of the Pilmaiquén River, a tributary of the Bueno River.
  • C. Dargai hydropower installations
    Dargai hydropower installations are a set of hydroelectric power stations in Pakistan that harness the flow of the Swat River to generate electricity for the surrounding region.
  • D. Laja River hydroelectric plants
    The Laja River hydroelectric plants are a group of power-generating facilities on Chile’s Laja River that play a key role in supplying electricity to the Biobío region.
  • E. Teesta hydropower cascade
    Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653c4a8a88190afc2f2cd1ebbbe1e completed April 20, 2026, 4:26 p.m.
Created at: April 10, 2026, 1:49 p.m.