Triple

T19787485
Position Surface form Disambiguated ID Type / Status
Subject Santa Fe River Park E475312 entity
Predicate instanceOf P0 FINISHED
Object trail corridor C11502 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: trail corridor
Context triple: [Santa Fe River Park, instanceOf, trail corridor]
  • A. trail section
    A trail section is a distinct, continuous segment of a larger trail network, defined by its start and end points, terrain characteristics, and associated difficulty or usage attributes.
  • B. trail system
    A trail system is an interconnected network of designated paths and routes designed to guide users through natural or built environments for recreation, transportation, or exploration.
  • C. trail
    A trail is a marked or worn path through natural or built environments, intended for travel, recreation, or access by people or animals.
  • D. state scenic corridor
    A state scenic corridor is a designated roadway or linear area recognized and protected by a state for its outstanding natural, cultural, or visual qualities, often with special regulations to preserve its scenic character.
  • E. ecological corridor chosen
    An ecological corridor is a natural or restored habitat pathway that connects separate wildlife populations, enabling species movement, gene flow, and ecosystem resilience across fragmented landscapes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:49 p.m.