Triple
T19781619
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sir Patrick Abercrombie |
E475145
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object | Bristol reconstruction plan |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bristol reconstruction plan | Statement: [Sir Patrick Abercrombie, notableWork, Bristol reconstruction plan]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bristol reconstruction plan Context triple: [Sir Patrick Abercrombie, notableWork, Bristol reconstruction plan]
-
A.
Blatchford redevelopment project
The Blatchford redevelopment project is a large-scale, sustainable urban community being built on the former Edmonton City Centre Airport lands in Edmonton, Alberta.
-
B.
South Bank Parklands redevelopment
The South Bank Parklands redevelopment is a major urban renewal project in Brisbane that transformed the former World Expo ’88 site into a prominent riverside cultural, recreational, and tourism precinct.
-
C.
Southampton Waterside regeneration
Southampton Waterside regeneration is a major waterfront redevelopment initiative in Southampton focused on transforming former industrial and dockland areas into mixed-use residential, commercial, and leisure spaces.
-
D.
Lancaster riverside regeneration
Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
-
E.
Baglan Bay redevelopment
Baglan Bay redevelopment is a large-scale regeneration project in Neath Port Talbot, South Wales, transforming former industrial and brownfield land into a modern mixed-use area focused on business, energy, and community development.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Bristol reconstruction plan Target entity description: The Bristol reconstruction plan was a major mid-20th-century urban redevelopment scheme for the city of Bristol, England, created to guide its post–Second World War rebuilding and modernization.
-
A.
Blatchford redevelopment project
The Blatchford redevelopment project is a large-scale, sustainable urban community being built on the former Edmonton City Centre Airport lands in Edmonton, Alberta.
-
B.
South Bank Parklands redevelopment
The South Bank Parklands redevelopment is a major urban renewal project in Brisbane that transformed the former World Expo ’88 site into a prominent riverside cultural, recreational, and tourism precinct.
-
C.
Southampton Waterside regeneration
Southampton Waterside regeneration is a major waterfront redevelopment initiative in Southampton focused on transforming former industrial and dockland areas into mixed-use residential, commercial, and leisure spaces.
-
D.
Lancaster riverside regeneration
Lancaster riverside regeneration is an urban redevelopment project transforming Lancaster’s riverfront area into a modern, accessible, and attractive public and commercial space.
-
E.
Baglan Bay redevelopment
Baglan Bay redevelopment is a large-scale regeneration project in Neath Port Talbot, South Wales, transforming former industrial and brownfield land into a modern mixed-use area focused on business, energy, and community development.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51b014081908b263e167370529a |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e653846a248190adc4afe0dc29a402 |
completed | April 20, 2026, 4:25 p.m. |
Created at: April 10, 2026, 1:49 p.m.