Triple

T19764989
Position Surface form Disambiguated ID Type / Status
Subject Chabacano E474729 entity
Predicate servedByLine P1293 FINISHED
Object Line 8 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 8 | Statement: [Chabacano, servedByLine, Line 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 8
Context triple: [Chabacano, servedByLine, Line 8]
  • A. Line 8
    Line 8 is a rapid transit line of the Beijing Subway system that serves key central and northern districts of Beijing.
  • B. Line 8
    Line 8 is a line of the Mexico City Metro system that runs in a generally north–south direction, connecting key residential and commercial areas of the city.
  • C. Line 8
    Line 8 is a rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's key urban rail corridors.
  • D. Line 8
    Line 8 is a rapid transit line of the Shenzhen Metro system in Shenzhen, China, serving as part of the city's expanding urban rail network.
  • E. Line 8
    Line 8 is a route of the Seoul Metropolitan Subway system that serves southeastern parts of Seoul and nearby areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 8
Target entity description: Line 8 is one of the lines of the Mexico City Metro system, running across the city and connecting multiple key stations including Chabacano.
  • A. Line 8 chosen
    Line 8 is a line of the Mexico City Metro system that runs in a generally north–south direction, connecting key residential and commercial areas of the city.
  • B. Line 8
    Line 8 is a route of Mexico City’s Metrobús bus rapid transit system, serving key corridors with dedicated lanes and station platforms.
  • C. Line 8
    Line 8 is a rapid transit line of the Hangzhou Metro system in Hangzhou, China, serving as part of the city's expanding urban rail network.
  • D. Line 8
    Line 8 is a rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's key urban rail corridors.
  • E. Line 8
    Line 8 is a route of the Seoul Metropolitan Subway system that serves southeastern parts of Seoul and nearby areas.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51a43a08190956bc6df13c91a77 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653226af081909992ff5568bb54a5 completed April 20, 2026, 4:24 p.m.
Created at: April 10, 2026, 1:48 p.m.