Triple

T19760275
Position Surface form Disambiguated ID Type / Status
Subject Burlington Junction, Missouri E474608 entity
Predicate roadAccessVia P9041 FINISHED
Object Missouri Route 148 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri Route 148 | Statement: [Burlington Junction, Missouri, roadAccessVia, Missouri Route 148]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri Route 148
Context triple: [Burlington Junction, Missouri, roadAccessVia, Missouri Route 148]
  • A. Missouri Route 149
    Missouri Route 149 is a state highway in northern Missouri that runs generally north–south through rural areas, including Macon County.
  • B. Missouri Route 140
    Missouri Route 140 is a state highway in Missouri that serves as a short connector route between local communities and larger regional roads.
  • C. Missouri Route 141
    Missouri Route 141 is a major north–south state highway in the St. Louis metropolitan area that serves as a key suburban arterial route through several communities, including Chesterfield, Missouri.
  • D. Missouri Route 142
    Missouri Route 142 is a state highway in southern Missouri that runs east–west across the Ozarks, connecting rural communities near the Arkansas border.
  • E. Missouri Route 154
    Missouri Route 154 is a state highway in Missouri that runs east–west through rural areas, including Monroe County, connecting small communities and other regional routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri Route 148
Target entity description: Missouri Route 148 is a state highway in northwest Missouri that runs north–south through Nodaway County, connecting rural communities and linking to Iowa Highway 148 at the state line.
  • A. Missouri Route 149
    Missouri Route 149 is a state highway in northern Missouri that runs generally north–south through rural areas, including Macon County.
  • B. Missouri Route 140
    Missouri Route 140 is a state highway in Missouri that serves as a short connector route between local communities and larger regional roads.
  • C. Missouri Route 141
    Missouri Route 141 is a major north–south state highway in the St. Louis metropolitan area that serves as a key suburban arterial route through several communities, including Chesterfield, Missouri.
  • D. Missouri Route 142
    Missouri Route 142 is a state highway in southern Missouri that runs east–west across the Ozarks, connecting rural communities near the Arkansas border.
  • E. Missouri Route 154
    Missouri Route 154 is a state highway in Missouri that runs east–west through rural areas, including Monroe County, connecting small communities and other regional routes.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51940a0819087bd2996f98da668 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6531f38b48190b1663870a8da5a59 completed April 20, 2026, 4:23 p.m.
Created at: April 10, 2026, 1:48 p.m.