Triple

T19751368
Position Surface form Disambiguated ID Type / Status
Subject Kinsman, Ohio E474380 entity
Predicate roadAccessVia P9041 FINISHED
Object Ohio State Route 5 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ohio State Route 5 | Statement: [Kinsman, Ohio, roadAccessVia, Ohio State Route 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 5
Context triple: [Kinsman, Ohio, roadAccessVia, Ohio State Route 5]
  • A. Ohio State Route 50
    Ohio State Route 50 is a major east–west highway running across Ohio, connecting numerous cities and towns as part of the broader U.S. Route 50 corridor.
  • B. Ohio State Route 59
    Ohio State Route 59 is an east–west state highway in northeastern Ohio that serves as a primary thoroughfare through cities such as Kent and Akron.
  • C. Ohio State Route 57
    Ohio State Route 57 is a north–south state highway in northern Ohio that serves as a key connector through Lorain and Medina counties, linking several major routes and local communities.
  • D. Ohio State Route 54
    Ohio State Route 54 is a north–south state highway in west-central Ohio that connects several small communities and rural areas, including parts of Champaign County.
  • E. Ohio State Route 58
    Ohio State Route 58 is a north–south state highway in northern Ohio that runs between Ashland and Lorain, serving as a connector through several small communities and rural areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 5
Target entity description: Ohio State Route 5 is an east–west state highway in northeastern Ohio that connects several communities, including Warren and Kinsman, and serves as a key regional transportation corridor.
  • A. Ohio State Route 50
    Ohio State Route 50 is a major east–west highway running across Ohio, connecting numerous cities and towns as part of the broader U.S. Route 50 corridor.
  • B. Ohio State Route 59
    Ohio State Route 59 is an east–west state highway in northeastern Ohio that serves as a primary thoroughfare through cities such as Kent and Akron.
  • C. Ohio State Route 57
    Ohio State Route 57 is a north–south state highway in northern Ohio that serves as a key connector through Lorain and Medina counties, linking several major routes and local communities.
  • D. Ohio State Route 54
    Ohio State Route 54 is a north–south state highway in west-central Ohio that connects several small communities and rural areas, including parts of Champaign County.
  • E. Ohio State Route 58
    Ohio State Route 58 is a north–south state highway in northern Ohio that runs between Ashland and Lorain, serving as a connector through several small communities and rural areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51940a0819087bd2996f98da668 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65299a7048190a9b22307ac06bd03 completed April 20, 2026, 4:21 p.m.
Created at: April 10, 2026, 1:48 p.m.