Triple
T19746028
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stagecoach South Wales |
E474252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Stagecoach Group subsidiary |
C42558
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Stagecoach Group subsidiary Context triple: [Stagecoach South Wales, instanceOf, Stagecoach Group subsidiary]
-
A.
Vinci Group subsidiary
A Vinci Group subsidiary is a company that is majority-owned or controlled by Vinci Group and operates under its strategic, financial, and governance framework while conducting specific business activities within the group’s overall portfolio.
-
B.
Berkshire Hathaway subsidiary
A Berkshire Hathaway subsidiary is a company in which Berkshire Hathaway holds a controlling ownership stake, operating independently while contributing to the conglomerate’s overall financial performance and strategic objectives.
-
C.
automotive company subsidiary
An automotive company subsidiary is a legally distinct company controlled by a larger parent automaker that focuses on specific functions such as manufacturing, design, regional operations, or specialized vehicle brands within the overall corporate structure.
-
D.
Airbus subsidiary
An Airbus subsidiary is a legally distinct company that is owned or controlled by Airbus and operates specific aspects of its aerospace, defense, or related business activities.
-
E.
Hyundai subsidiary
A Hyundai subsidiary is a company that is owned or controlled by the Hyundai Motor Group or Hyundai Corporation to conduct specific business operations under the broader Hyundai brand.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51940a0819087bd2996f98da668 |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:47 p.m.