Triple

T19743686
Position Surface form Disambiguated ID Type / Status
Subject Medellín River E474194 entity
Predicate hasRecreationAreaAlong P5383 FINISHED
Object Parques del Río Medellín urban park project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parques del Río Medellín urban park project | Statement: [Medellín River, hasRecreationAreaAlong, Parques del Río Medellín urban park project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Parques del Río Medellín urban park project
Context triple: [Medellín River, hasRecreationAreaAlong, Parques del Río Medellín urban park project]
  • A. Parque de Bolívar (Cali)
    Parque de Bolívar in Cali is a historic public square and green space dedicated to Simón Bolívar, serving as a prominent civic and commemorative landmark in the city.
  • B. Parque de la Independencia (Medellín)
    Parque de la Independencia (Medellín) is a historic public park in Medellín, Colombia, dedicated to commemorating the nation’s struggle and heroes of the War of Independence.
  • C. Mapocho Urbano Limpio project
    The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
  • D. Madrid Río park
    Madrid Río park is a large urban green space in Madrid that features recreational areas, cultural facilities, and landscaped promenades along the banks of the Manzanares River.
  • E. Bogotá water supply system
    The Bogotá water supply system is the integrated network of reservoirs, treatment plants, and distribution infrastructure that provides potable water to Colombia’s capital and its metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Parques del Río Medellín urban park project
Target entity description: Parques del Río Medellín urban park project is a major urban redevelopment initiative in Medellín, Colombia, that transforms the riverfront into interconnected green public spaces with parks, walkways, and recreational areas.
  • A. Parque de Bolívar (Cali)
    Parque de Bolívar in Cali is a historic public square and green space dedicated to Simón Bolívar, serving as a prominent civic and commemorative landmark in the city.
  • B. Parque de la Independencia (Medellín)
    Parque de la Independencia (Medellín) is a historic public park in Medellín, Colombia, dedicated to commemorating the nation’s struggle and heroes of the War of Independence.
  • C. Mapocho Urbano Limpio project
    The Mapocho Urbano Limpio project is an environmental initiative aimed at cleaning up and restoring the ecological and recreational quality of the Mapocho River in Santiago, Chile.
  • D. Madrid Río park
    Madrid Río park is a large urban green space in Madrid that features recreational areas, cultural facilities, and landscaped promenades along the banks of the Manzanares River.
  • E. Bogotá water supply system
    The Bogotá water supply system is the integrated network of reservoirs, treatment plants, and distribution infrastructure that provides potable water to Colombia’s capital and its metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51940a0819087bd2996f98da668 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65162f0f88190b652fff01ee23090 completed April 20, 2026, 4:16 p.m.
Created at: April 10, 2026, 1:47 p.m.