Triple

T19742923
Position Surface form Disambiguated ID Type / Status
Subject Jefferson County, Illinois E474174 entity
Predicate hasInterstateHighway P385 FINISHED
Object Interstate 64 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 64 | Statement: [Jefferson County, Illinois, hasInterstateHighway, Interstate 64]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 64
Context triple: [Jefferson County, Illinois, hasInterstateHighway, Interstate 64]
  • A. Interstate 64 chosen
    Interstate 64 is a major east–west U.S. Interstate Highway running from Missouri to Virginia, connecting Midwestern cities to the Atlantic coast.
  • B. Interstate 640
    Interstate 640 is an auxiliary beltway of Interstate 40 that serves as a northern bypass around Knoxville, Tennessee.
  • C. Interstate 24
    Interstate 24 is a major east–west U.S. highway running through the central United States, connecting cities in states such as Illinois, Kentucky, Tennessee, and Georgia.
  • D. Interstate 69
    Interstate 69 is a major north–south U.S. highway that runs through multiple states in the Midwest and South, serving as an important regional and interstate transportation route.
  • E. Interstate 68
    Interstate 68 is an east–west U.S. highway running through northern West Virginia and western Maryland, providing a key Appalachian corridor connecting Morgantown to I-79 and I-70.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51940a0819087bd2996f98da668 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65162f0f88190b652fff01ee23090 completed April 20, 2026, 4:16 p.m.
Created at: April 10, 2026, 1:47 p.m.