Triple
T19739522
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Santan Freeway |
E474076
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | segment of Loop 202 |
C1129
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: segment of Loop 202 Context triple: [Santan Freeway, instanceOf, segment of Loop 202]
-
A.
Interstate business loop
An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
-
B.
Farm to Market Road
A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
-
C.
highway loop
A highway loop is a circular or semi-circular roadway segment that connects different parts of a highway system, allowing vehicles to change direction or access intersecting routes without stopping.
-
D.
highway segment
chosen
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
E.
road segment
A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e517ebd48190979ee76723bcfadf |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:47 p.m.