Triple

T19739522
Position Surface form Disambiguated ID Type / Status
Subject Santan Freeway E474076 entity
Predicate instanceOf P0 FINISHED
Object segment of Loop 202 C1129 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: segment of Loop 202
Context triple: [Santan Freeway, instanceOf, segment of Loop 202]
  • A. Interstate business loop
    An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
  • B. Farm to Market Road
    A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
  • C. highway loop
    A highway loop is a circular or semi-circular roadway segment that connects different parts of a highway system, allowing vehicles to change direction or access intersecting routes without stopping.
  • D. highway segment chosen
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • E. road segment
    A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e517ebd48190979ee76723bcfadf completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:47 p.m.