Triple

T19734329
Position Surface form Disambiguated ID Type / Status
Subject Gimpo–Taipei Songshan route E473937 entity
Predicate instanceOf P0 FINISHED
Object regional air corridor C31875 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional air corridor
Context triple: [Gimpo–Taipei Songshan route, instanceOf, regional air corridor]
  • A. regional air route chosen
    A regional air route is a defined flight path connecting airports within a specific geographic area, typically served by short- to medium-haul aircraft to facilitate local or intra-regional air travel.
  • B. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. regional flight system
    A regional flight system manages the scheduling, routing, and operation of short- to medium-haul flights within a specific geographic area, coordinating aircraft, crew, airports, and passenger services.
  • D. international air route
    An international air route is a designated flight path that connects airports in different countries, governed by bilateral or multilateral agreements and aviation regulations.
  • E. aviation infrastructure network
    An aviation infrastructure network is an interconnected system of airports, airways, navigation aids, communication systems, and support facilities that collectively enable the safe, efficient movement of aircraft and passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e517ebd48190979ee76723bcfadf completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:47 p.m.