Triple
T19724523
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The New York Central Railroad Office Building projects |
E473690
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | architectural projects |
C7141
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: architectural projects Context triple: [The New York Central Railroad Office Building projects, instanceOf, architectural projects]
-
A.
architectural work
chosen
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
B.
architectural design
Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
-
C.
architectural project involvement
Architectural project involvement is the coordinated participation of stakeholders, professionals, and resources throughout the planning, design, and execution phases of an architectural endeavor.
-
D.
architectural project portfolio
An architectural project portfolio is a curated collection of an architect’s or firm’s design works, showcasing project concepts, processes, visuals, and outcomes to demonstrate skills, style, and professional capabilities.
-
E.
architectural consulting project
An architectural consulting project is a professional engagement in which architects analyze client needs, evaluate existing conditions, and develop strategic design recommendations, plans, and guidance to inform and optimize building or spatial development decisions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e517ebd48190979ee76723bcfadf |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:46 p.m.