Triple

T19712118
Position Surface form Disambiguated ID Type / Status
Subject Sakae underground shopping malls E473375 entity
Predicate instanceOf P0 FINISHED
Object underground shopping mall complex C1998 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground shopping mall complex
Context triple: [Sakae underground shopping malls, instanceOf, underground shopping mall complex]
  • A. shopping centre
    A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
  • B. shopping mall chosen
    A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
  • C. shopping area
    A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
  • D. campus mall
    A campus mall is a central, often pedestrian-oriented outdoor or semi-outdoor space on a college or university campus that serves as a primary thoroughfare and social gathering area, typically lined with academic buildings, services, and green spaces.
  • E. underground structure
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e516dd048190a0b6c93ea3e71f58 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:46 p.m.