Triple
T19642232
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Feather River Fish Hatchery |
E471566
|
entity |
| Predicate | constructedAsPartOf |
P35910
|
FINISHED |
| Object | Oroville Dam project |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oroville Dam project | Statement: [Feather River Fish Hatchery, constructedAsPartOf, Oroville Dam project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Oroville Dam project Context triple: [Feather River Fish Hatchery, constructedAsPartOf, Oroville Dam project]
-
A.
Chico River Dam Project
The Chico River Dam Project was a controversial Marcos-era hydroelectric and irrigation scheme in the northern Philippines that faced strong opposition from Indigenous communities and environmental advocates.
-
B.
Feather River Project
The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
-
C.
Oroville Dam
chosen
Oroville Dam is a large earthfill embankment dam on the Feather River in Northern California, serving as a key water storage, flood control, and hydroelectric facility.
-
D.
Truckee-Carson Project
The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
-
E.
Napa River Flood Protection Project
The Napa River Flood Protection Project is a comprehensive civil works initiative in Napa, California, designed to reduce flooding risks while restoring river habitats and integrating recreational and environmental enhancements into the riverfront.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e511f28481909f4bc3ea9191e54a |
completed | April 10, 2026, 11:54 a.m. |
| NER | Named-entity recognition | batch_69e64122d9f48190961c4b460256f9e7 |
completed | April 20, 2026, 3:07 p.m. |
Created at: April 10, 2026, 1:44 p.m.