Triple

T19624515
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 30 E471098 entity
Predicate connectedTo P37 FINISHED
Object Georgia State Route 135 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Georgia State Route 135 | Statement: [Georgia State Route 30, connectedTo, Georgia State Route 135]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Georgia State Route 135
Context triple: [Georgia State Route 30, connectedTo, Georgia State Route 135]
  • A. Georgia State Route 130
    Georgia State Route 130 is a state highway in southeastern Georgia that serves as a regional connector route, including access to and from the city of Vidalia.
  • B. Georgia State Route 137
    Georgia State Route 137 is a state highway in west-central Georgia that runs through several rural counties, connecting small communities and providing regional access to larger routes.
  • C. Georgia State Route 136
    Georgia State Route 136 is a state highway in northern Georgia that runs east–west across several counties, providing regional connectivity through rural and mountainous areas.
  • D. Georgia State Route 133
    Georgia State Route 133 is a state highway in southwestern Georgia that connects several communities and facilitates regional travel between cities such as Albany and Valdosta.
  • E. Georgia State Route 139
    Georgia State Route 139 is a state highway in the Atlanta metropolitan area that connects several communities in western Georgia, including Mableton.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Georgia State Route 135
Target entity description: Georgia State Route 135 is a state highway in Georgia that runs generally north–south through rural counties, connecting small towns and intersecting several major routes.
  • A. Georgia State Route 130
    Georgia State Route 130 is a state highway in southeastern Georgia that serves as a regional connector route, including access to and from the city of Vidalia.
  • B. Georgia State Route 137
    Georgia State Route 137 is a state highway in west-central Georgia that runs through several rural counties, connecting small communities and providing regional access to larger routes.
  • C. Georgia State Route 136
    Georgia State Route 136 is a state highway in northern Georgia that runs east–west across several counties, providing regional connectivity through rural and mountainous areas.
  • D. Georgia State Route 133
    Georgia State Route 133 is a state highway in southwestern Georgia that connects several communities and facilitates regional travel between cities such as Albany and Valdosta.
  • E. Georgia State Route 139
    Georgia State Route 139 is a state highway in the Atlanta metropolitan area that connects several communities in western Georgia, including Mableton.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e510fa248190b7afb274a1d4cf73 completed April 10, 2026, 11:54 a.m.
NER Named-entity recognition batch_69e640e92ff48190ae6e6ba2c603d5e7 completed April 20, 2026, 3:06 p.m.
Created at: April 10, 2026, 1:44 p.m.