Triple
T19604405
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kashiwazaki-Kariwa Nuclear Power Plant |
E470565
|
entity |
| Predicate | regulatoryInspections |
P93054
|
FINISHED |
| Object | enhanced after Fukushima Daiichi accident |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: enhanced after Fukushima Daiichi accident | Statement: [Kashiwazaki-Kariwa Nuclear Power Plant, regulatoryInspections, enhanced after Fukushima Daiichi accident]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: regulatoryInspections Context triple: [Kashiwazaki-Kariwa Nuclear Power Plant, regulatoryInspections, enhanced after Fukushima Daiichi accident]
-
A.
inspectionAuthority
Indicates that one entity has the official power or responsibility to inspect, examine, or audit another entity or its activities.
-
B.
regulatesFacility
Indicates that one entity has authority to control, oversee, or set rules governing the operation or behavior of a facility.
-
C.
regulationAtIssue
Indicates that a specific regulation is the subject of concern, dispute, or analysis in the given context.
-
D.
regulatoryOutcome
Indicates the result or consequence of a regulatory process, such as approval, rejection, modification, or other formal decision made by a regulatory authority regarding an entity or action.
-
E.
inspectionFrequency
chosen
Indicates how often an entity is examined, checked, or reviewed within a given time period.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e510024481908415c0d616fa6186 |
completed | April 10, 2026, 11:54 a.m. |
| NER | Named-entity recognition | batch_69e64081af6c8190868b73b07c874cd5 |
completed | April 20, 2026, 3:04 p.m. |
| PD | Predicate disambiguation | batch_69e514e166dc8190a0f147e0b4c8bbe7 |
completed | April 19, 2026, 5:46 p.m. |
Created at: April 10, 2026, 1:43 p.m.