Triple
T19604390
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kashiwazaki-Kariwa Nuclear Power Plant |
E470565
|
entity |
| Predicate | reactorModel |
P52112
|
FINISHED |
| Object | ABWR |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ABWR | Statement: [Kashiwazaki-Kariwa Nuclear Power Plant, reactorModel, ABWR]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ABWR Context triple: [Kashiwazaki-Kariwa Nuclear Power Plant, reactorModel, ABWR]
-
A.
ABB Atom BWR
ABB Atom BWR is a Swedish-designed boiling water reactor type developed by ABB Atom for use in commercial nuclear power plants.
-
B.
ESBWR
ESBWR (Economic Simplified Boiling Water Reactor) is a Generation III+ nuclear power reactor design by GE Hitachi that uses natural circulation cooling and enhanced passive safety systems.
-
C.
BWR-4
BWR-4 is a General Electric-designed boiling water reactor model widely used in commercial nuclear power plants built during the late 1960s and 1970s.
-
D.
BWR-5
BWR-5 is an advanced generation of boiling water reactor design featuring improved safety, efficiency, and performance over earlier BWR models.
-
E.
BWR-3
BWR-3 is a third-generation boiling water reactor design developed by General Electric and used in several nuclear power plants worldwide, including Fukushima Daiichi Unit 3.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: ABWR Target entity description: ABWR (Advanced Boiling Water Reactor) is a Generation III nuclear reactor design known for its enhanced safety features, higher efficiency, and use in several modern commercial nuclear power plants.
-
A.
ABB Atom BWR
ABB Atom BWR is a Swedish-designed boiling water reactor type developed by ABB Atom for use in commercial nuclear power plants.
-
B.
ESBWR
ESBWR (Economic Simplified Boiling Water Reactor) is a Generation III+ nuclear power reactor design by GE Hitachi that uses natural circulation cooling and enhanced passive safety systems.
-
C.
BWR-4
BWR-4 is a General Electric-designed boiling water reactor model widely used in commercial nuclear power plants built during the late 1960s and 1970s.
-
D.
BWR-5
BWR-5 is an advanced generation of boiling water reactor design featuring improved safety, efficiency, and performance over earlier BWR models.
-
E.
BWR-3
BWR-3 is a third-generation boiling water reactor design developed by General Electric and used in several nuclear power plants worldwide, including Fukushima Daiichi Unit 3.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e510024481908415c0d616fa6186 |
completed | April 10, 2026, 11:54 a.m. |
| NER | Named-entity recognition | batch_69e64081af6c8190868b73b07c874cd5 |
completed | April 20, 2026, 3:04 p.m. |
Created at: April 10, 2026, 1:43 p.m.