Triple

T19578647
Position Surface form Disambiguated ID Type / Status
Subject Chuseok E489926 entity
Predicate instanceOf P0 FINISHED
Object public holiday in South Korea C288 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public holiday in South Korea
Context triple: [Chuseok, instanceOf, public holiday in South Korea]
  • A. public holiday chosen
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • B. local holiday
    A local holiday is a day of celebration or observance recognized and typically granted time off only within a specific city, region, or locality rather than an entire country.
  • C. package holiday provider
    A package holiday provider is a company that bundles and sells complete vacation packages, typically including transport, accommodation, and sometimes activities or meals, for a single combined price.
  • D. public holiday system
    A public holiday system manages, stores, and provides access to information about official holidays, including their dates, types, and applicable regions, to support scheduling, compliance, and planning activities.
  • E. holiday standard
    A holiday standard is a widely recognized and repeatedly celebrated song, film, or tradition that recurs each holiday season and is culturally regarded as timeless.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dd9374819098e36349b3211663 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:42 p.m.