Triple

T19570442
Position Surface form Disambiguated ID Type / Status
Subject A465 Neath Port Talbot distributor roads E489697 entity
Predicate instanceOf P0 FINISHED
Object distributor road system C3822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: distributor road system
Context triple: [A465 Neath Port Talbot distributor roads, instanceOf, distributor road system]
  • A. road network chosen
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • B. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • C. Farm to Market Road
    A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
  • D. global distribution system provider
    A global distribution system provider is a company that operates a computerized network enabling transactions between travel service suppliers (such as airlines, hotels, and car rental companies) and travel agencies or end customers worldwide.
  • E. road transport node
    A road transport node is a specific location within a road network where vehicles and travelers converge, diverge, or transfer, such as intersections, terminals, or hubs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dd9374819098e36349b3211663 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:42 p.m.