Triple

T19564290
Position Surface form Disambiguated ID Type / Status
Subject Vladivostok bridges E489537 entity
Predicate majorConstructionBoost P136593 FINISHED
Object APEC summit 2012 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: APEC summit 2012 | Statement: [Vladivostok bridges, majorConstructionBoost, APEC summit 2012]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: APEC summit 2012
Context triple: [Vladivostok bridges, majorConstructionBoost, APEC summit 2012]
  • A. APEC fora
    APEC fora are the various committees, working groups, and expert bodies within the Asia-Pacific Economic Cooperation framework that develop and coordinate policies and initiatives across specific issue areas.
  • B. APEC Ministerial Meeting
    The APEC Ministerial Meeting is a high-level gathering of foreign and trade ministers from Asia-Pacific Economic Cooperation member economies that sets priorities and prepares decisions for APEC leaders.
  • C. APEC Economic Leaders' Meeting chosen
    The APEC Economic Leaders' Meeting is the annual summit where heads of state and government from Asia-Pacific Economic Cooperation member economies convene to discuss and coordinate regional economic integration and policy priorities.
  • D. APEC CEO Summit
    The APEC CEO Summit is a high-level business forum where chief executives, entrepreneurs, and thought leaders from Asia-Pacific economies convene alongside APEC leaders to discuss regional economic integration, trade, and investment priorities.
  • E. APEC Senior Officials' Meeting
    The APEC Senior Officials' Meeting is a high-level gathering of senior government representatives from Asia-Pacific Economic Cooperation member economies that coordinates and advances APEC’s annual work agenda and policy priorities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorConstructionBoost
Context triple: [Vladivostok bridges, majorConstructionBoost, APEC summit 2012]
  • A. majorConstruction
    Indicates a relationship where a construction project is large-scale, significant, or of primary importance in scope, impact, or resources.
  • B. majorConstructionUnder
    Indicates that a location or structure is currently undergoing significant construction work or large-scale building activity.
  • C. laterConstruction
    Indicates that one construction event or structure occurred or was built after another in time.
  • D. constructionExpanded
    Indicates that a construction project or structure has been enlarged or extended beyond its original size or scope.
  • E. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63f76b220819096e668534c6bac67 completed April 20, 2026, 3 p.m.
PD Predicate disambiguation batch_69e514d4df3c8190b7e9b3b4fdf9452a completed April 19, 2026, 5:45 p.m.
PDg Predicate description generation batch_69e51796b4c48190b721114dde654bd7 completed April 19, 2026, 5:57 p.m.
Created at: April 10, 2026, 1:42 p.m.