Triple

T19564045
Position Surface form Disambiguated ID Type / Status
Subject Baishan Dam E489531 entity
Predicate upstreamFrom P5955 FINISHED
Object Fengman Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fengman Dam | Statement: [Baishan Dam, upstreamFrom, Fengman Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fengman Dam
Context triple: [Baishan Dam, upstreamFrom, Fengman Dam]
  • A. Fengman Dam chosen
    Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
  • B. Howland Dam
    Howland Dam is a hydroelectric dam on Maine’s Piscataquis River that became a focal point of river restoration efforts to improve fish passage and ecosystem health.
  • C. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • D. Walter Hill Dam
    Walter Hill Dam is a small historic dam and recreational site on the East Fork of the Stones River in Rutherford County, Tennessee.
  • E. O’Neill Dam
    O’Neill Dam is an earthfill embankment dam in California that forms the O’Neill Forebay as part of the state’s Central Valley Project water storage and conveyance system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63f75b2d481909fa3f603fe6bd5bd completed April 20, 2026, 3 p.m.
Created at: April 10, 2026, 1:42 p.m.