Triple
T19564045
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baishan Dam |
E489531
|
entity |
| Predicate | upstreamFrom |
P5955
|
FINISHED |
| Object | Fengman Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fengman Dam | Statement: [Baishan Dam, upstreamFrom, Fengman Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Fengman Dam Context triple: [Baishan Dam, upstreamFrom, Fengman Dam]
-
A.
Fengman Dam
chosen
Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
-
B.
Howland Dam
Howland Dam is a hydroelectric dam on Maine’s Piscataquis River that became a focal point of river restoration efforts to improve fish passage and ecosystem health.
-
C.
Merwin Dam
Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
-
D.
Walter Hill Dam
Walter Hill Dam is a small historic dam and recreational site on the East Fork of the Stones River in Rutherford County, Tennessee.
-
E.
O’Neill Dam
O’Neill Dam is an earthfill embankment dam in California that forms the O’Neill Forebay as part of the state’s Central Valley Project water storage and conveyance system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63f75b2d481909fa3f603fe6bd5bd |
completed | April 20, 2026, 3 p.m. |
Created at: April 10, 2026, 1:42 p.m.