Triple

T19557428
Position Surface form Disambiguated ID Type / Status
Subject Roberts Bank port facilities E489351 entity
Predicate connectedBy P37 FINISHED
Object South Fraser Perimeter Road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Fraser Perimeter Road | Statement: [Roberts Bank port facilities, connectedBy, South Fraser Perimeter Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Fraser Perimeter Road
Context triple: [Roberts Bank port facilities, connectedBy, South Fraser Perimeter Road]
  • A. Steveston Highway
    Steveston Highway is a major east–west arterial road in Richmond, British Columbia, connecting residential and commercial areas to key regional routes and riverfront communities.
  • B. Lougheed Highway
    Lougheed Highway is a major east–west arterial route in Metro Vancouver, British Columbia, connecting several municipalities and serving as an important commuter and commercial corridor.
  • C. Alberni Highway
    Alberni Highway is a major road on Vancouver Island in British Columbia, Canada, connecting the city of Port Alberni with other regional communities and transportation routes.
  • D. George Parks Highway
    The George Parks Highway is a major Alaskan roadway that connects Anchorage to Fairbanks, passing near Denali National Park and serving as a key north–south transportation corridor in the state.
  • E. Perimeter Road
    Perimeter Road is a scenic loop route encircling Angel Island in San Francisco Bay, offering access to park sites and panoramic coastal views.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Fraser Perimeter Road
Target entity description: South Fraser Perimeter Road is a major highway in Metro Vancouver, British Columbia, that provides a key goods-movement and commuter route along the south side of the Fraser River, linking ports, industrial areas, and regional highways.
  • A. Steveston Highway
    Steveston Highway is a major east–west arterial road in Richmond, British Columbia, connecting residential and commercial areas to key regional routes and riverfront communities.
  • B. Lougheed Highway
    Lougheed Highway is a major east–west arterial route in Metro Vancouver, British Columbia, connecting several municipalities and serving as an important commuter and commercial corridor.
  • C. Alberni Highway
    Alberni Highway is a major road on Vancouver Island in British Columbia, Canada, connecting the city of Port Alberni with other regional communities and transportation routes.
  • D. George Parks Highway
    The George Parks Highway is a major Alaskan roadway that connects Anchorage to Fairbanks, passing near Denali National Park and serving as a key north–south transportation corridor in the state.
  • E. Perimeter Road
    Perimeter Road is a scenic loop route encircling Angel Island in San Francisco Bay, offering access to park sites and panoramic coastal views.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d34d1bc81908e5e10f069655866 completed April 20, 2026, 2:50 p.m.
Created at: April 10, 2026, 1:42 p.m.