Triple
T19555665
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Enguri Dam |
E489302
|
entity |
| Predicate | providesElectricityShare |
P136569
|
FINISHED |
| Object | a significant portion of Georgia's electricity demand |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: a significant portion of Georgia's electricity demand | Statement: [Enguri Dam, providesElectricityShare, a significant portion of Georgia's electricity demand]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: providesElectricityShare Context triple: [Enguri Dam, providesElectricityShare, a significant portion of Georgia's electricity demand]
-
A.
electrificationServedBy
Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
-
B.
electricityMarketedBy
Indicates that one entity is responsible for marketing, promoting, or selling electricity provided by another entity.
-
C.
electrificationCoverage
Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
-
D.
electrificationUsedBy
Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
-
E.
electrificationUsedByOtherOperator
Indicates that the type of railway electrification in question is utilized by an operator other than the primary or referenced operator.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63d335f888190abfc5ba974d3c65e |
completed | April 20, 2026, 2:50 p.m. |
| PD | Predicate disambiguation | batch_69e514d4df3c8190b7e9b3b4fdf9452a |
completed | April 19, 2026, 5:45 p.m. |
| PDg | Predicate description generation | batch_69e51796b4c48190b721114dde654bd7 |
completed | April 19, 2026, 5:57 p.m. |
Created at: April 10, 2026, 1:42 p.m.