Triple

T19555665
Position Surface form Disambiguated ID Type / Status
Subject Enguri Dam E489302 entity
Predicate providesElectricityShare P136569 FINISHED
Object a significant portion of Georgia's electricity demand LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: a significant portion of Georgia's electricity demand | Statement: [Enguri Dam, providesElectricityShare, a significant portion of Georgia's electricity demand]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: providesElectricityShare
Context triple: [Enguri Dam, providesElectricityShare, a significant portion of Georgia's electricity demand]
  • A. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • B. electricityMarketedBy
    Indicates that one entity is responsible for marketing, promoting, or selling electricity provided by another entity.
  • C. electrificationCoverage
    Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
  • D. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • E. electrificationUsedByOtherOperator
    Indicates that the type of railway electrification in question is utilized by an operator other than the primary or referenced operator.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d335f888190abfc5ba974d3c65e completed April 20, 2026, 2:50 p.m.
PD Predicate disambiguation batch_69e514d4df3c8190b7e9b3b4fdf9452a completed April 19, 2026, 5:45 p.m.
PDg Predicate description generation batch_69e51796b4c48190b721114dde654bd7 completed April 19, 2026, 5:57 p.m.
Created at: April 10, 2026, 1:42 p.m.