Triple

T19555655
Position Surface form Disambiguated ID Type / Status
Subject Enguri Dam E489302 entity
Predicate operator P179 FINISHED
Object Enguri HPP LLC NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Enguri HPP LLC | Statement: [Enguri Dam, operator, Enguri HPP LLC]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Enguri HPP LLC
Context triple: [Enguri Dam, operator, Enguri HPP LLC]
  • A. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • B. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • C. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • D. Charvak Hydroelectric Power Station
    Charvak Hydroelectric Power Station is a major hydroelectric facility in Uzbekistan that generates electricity using water from the Chirchiq River and the Charvak Reservoir.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Enguri HPP LLC
Target entity description: Enguri HPP LLC is the company responsible for operating the Enguri hydroelectric power plant in Georgia, one of the largest hydropower facilities in the Caucasus region.
  • A. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • B. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • C. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • D. Charvak Hydroelectric Power Station
    Charvak Hydroelectric Power Station is a major hydroelectric facility in Uzbekistan that generates electricity using water from the Chirchiq River and the Charvak Reservoir.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63d335f888190abfc5ba974d3c65e completed April 20, 2026, 2:50 p.m.
Created at: April 10, 2026, 1:42 p.m.