Triple
T19555417
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brandbu |
E489295
|
entity |
| Predicate | roadJunctionOf |
P6234
|
FINISHED |
| Object | Norwegian County Road 240 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Norwegian County Road 240 | Statement: [Brandbu, roadJunctionOf, Norwegian County Road 240]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Norwegian County Road 240 Context triple: [Brandbu, roadJunctionOf, Norwegian County Road 240]
-
A.
Norwegian County Road 245
Norwegian County Road 245 is a regional roadway in Norway that connects the town of Dokka with surrounding areas as part of the national county road network.
-
B.
Norwegian County Road 27
Norwegian County Road 27 is a scenic regional road in Norway that runs through mountainous and rural areas, connecting several inland communities and offering notable natural views.
-
C.
Norwegian National Road 241
Norwegian National Road 241 is a regional roadway in Norway that serves as an important connector route through Jevnaker and surrounding areas.
-
D.
Norwegian County Road 40
Norwegian County Road 40 is a regional road in Norway that connects several municipalities in Buskerud and Telemark, serving as an important inland route between the Oslo region and southern parts of the country.
-
E.
Norwegian County Road 29
Norwegian County Road 29 is a regional roadway in Norway that connects rural communities and scenic mountain areas, including the municipality of Folldal.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Norwegian County Road 240 Target entity description: Norwegian County Road 240 is a regional roadway in Norway that connects local communities in Innlandet county, including passing through the village of Brandbu.
-
A.
Norwegian County Road 245
Norwegian County Road 245 is a regional roadway in Norway that connects the town of Dokka with surrounding areas as part of the national county road network.
-
B.
Norwegian County Road 27
Norwegian County Road 27 is a scenic regional road in Norway that runs through mountainous and rural areas, connecting several inland communities and offering notable natural views.
-
C.
Norwegian National Road 241
Norwegian National Road 241 is a regional roadway in Norway that serves as an important connector route through Jevnaker and surrounding areas.
-
D.
Norwegian County Road 40
Norwegian County Road 40 is a regional road in Norway that connects several municipalities in Buskerud and Telemark, serving as an important inland route between the Oslo region and southern parts of the country.
-
E.
Norwegian County Road 29
Norwegian County Road 29 is a regional roadway in Norway that connects rural communities and scenic mountain areas, including the municipality of Folldal.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8dc5d8c8190a6d7bd8864f43ca0 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63d335f888190abfc5ba974d3c65e |
completed | April 20, 2026, 2:50 p.m. |
Created at: April 10, 2026, 1:42 p.m.