Triple
T19541822
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 35 in Ohio |
E488924
|
entity |
| Predicate | connectsToHighway |
P12245
|
FINISHED |
| Object | U.S. Route 23 in Ohio |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 23 in Ohio | Statement: [U.S. Route 35 in Ohio, connectsToHighway, U.S. Route 23 in Ohio]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 23 in Ohio Context triple: [U.S. Route 35 in Ohio, connectsToHighway, U.S. Route 23 in Ohio]
-
A.
U.S. Route 35 in Ohio
U.S. Route 35 in Ohio is a major east–west U.S. highway that connects the Dayton area to the West Virginia state line, serving as an important regional corridor across southern Ohio.
-
B.
U.S. Route 20 in Elyria, Ohio
U.S. Route 20 in Elyria, Ohio is a major east–west arterial highway that carries regional and local traffic through the city as part of the longer cross-country U.S. Route 20 corridor.
-
C.
U.S. Route 23 in Michigan
U.S. Route 23 in Michigan is a major north–south highway that runs along the state's eastern side, connecting Ohio to the Straits of Mackinac and serving key communities along Lake Huron.
-
D.
Ohio State Route 2
Ohio State Route 2 is a major east–west state highway in northern Ohio that runs along much of the Lake Erie shoreline, serving as a key commuter and regional travel corridor.
-
E.
U.S. Route 35
U.S. Route 35 is a major U.S. highway running generally northwest–southeast through several Midwestern and Appalachian states, connecting communities from Indiana to West Virginia.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 23 in Ohio Target entity description: U.S. Route 23 in Ohio is a major north–south U.S. highway that runs through the state, linking cities such as Portsmouth, Columbus, and Toledo as part of its broader route from Florida to Michigan.
-
A.
U.S. Route 35 in Ohio
U.S. Route 35 in Ohio is a major east–west U.S. highway that connects the Dayton area to the West Virginia state line, serving as an important regional corridor across southern Ohio.
-
B.
U.S. Route 20 in Elyria, Ohio
U.S. Route 20 in Elyria, Ohio is a major east–west arterial highway that carries regional and local traffic through the city as part of the longer cross-country U.S. Route 20 corridor.
-
C.
U.S. Route 23 in Michigan
U.S. Route 23 in Michigan is a major north–south highway that runs along the state's eastern side, connecting Ohio to the Straits of Mackinac and serving key communities along Lake Huron.
-
D.
Ohio State Route 2
Ohio State Route 2 is a major east–west state highway in northern Ohio that runs along much of the Lake Erie shoreline, serving as a key commuter and regional travel corridor.
-
E.
U.S. Route 35
U.S. Route 35 is a major U.S. highway running generally northwest–southeast through several Midwestern and Appalachian states, connecting communities from Indiana to West Virginia.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8db5b6c8190984b61f91981f575 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e6387442588190a2cdae60a6a940d6 |
completed | April 20, 2026, 2:30 p.m. |
Created at: April 10, 2026, 1:41 p.m.