Triple

T19541821
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 35 in Ohio E488924 entity
Predicate connectsToHighway P12245 FINISHED
Object Interstate 675 in Ohio NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 675 in Ohio | Statement: [U.S. Route 35 in Ohio, connectsToHighway, Interstate 675 in Ohio]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 675 in Ohio
Context triple: [U.S. Route 35 in Ohio, connectsToHighway, Interstate 675 in Ohio]
  • A. Interstate 275 in Ohio
    Interstate 275 in Ohio is a beltway freeway that forms part of the Cincinnati outer loop, encircling the metropolitan area and connecting multiple major highways across Ohio, Kentucky, and Indiana.
  • B. Interstate 475 (Ohio)
    Interstate 475 (Ohio) is a bypass auxiliary Interstate Highway that loops around the city of Toledo in northwestern Ohio, connecting with several major routes and easing traffic on the mainline I-75.
  • C. Interstate 675
    Interstate 675 is a short auxiliary interstate highway in the Atlanta metropolitan area that connects Interstate 75 in Henry County to Interstate 285 in DeKalb County, serving as a bypass route southeast of downtown Atlanta.
  • D. Interstate 635
    Interstate 635 is a short auxiliary Interstate Highway in the Kansas City metropolitan area that serves as a bypass and connector route between Kansas and Missouri.
  • E. Interstate 635
    Interstate 635 is a major beltway and commuter freeway serving the Dallas–Fort Worth metropolitan area in Texas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 675 in Ohio
Target entity description: Interstate 675 in Ohio is a suburban bypass of Dayton that connects Interstate 75 with Interstate 70 and serves as a major commuter and regional traffic corridor in southwestern Ohio.
  • A. Interstate 275 in Ohio
    Interstate 275 in Ohio is a beltway freeway that forms part of the Cincinnati outer loop, encircling the metropolitan area and connecting multiple major highways across Ohio, Kentucky, and Indiana.
  • B. Interstate 475 (Ohio)
    Interstate 475 (Ohio) is a bypass auxiliary Interstate Highway that loops around the city of Toledo in northwestern Ohio, connecting with several major routes and easing traffic on the mainline I-75.
  • C. Interstate 675
    Interstate 675 is a short auxiliary interstate highway in the Atlanta metropolitan area that connects Interstate 75 in Henry County to Interstate 285 in DeKalb County, serving as a bypass route southeast of downtown Atlanta.
  • D. Interstate 635
    Interstate 635 is a short auxiliary Interstate Highway in the Kansas City metropolitan area that serves as a bypass and connector route between Kansas and Missouri.
  • E. Interstate 635
    Interstate 635 is a major beltway and commuter freeway serving the Dallas–Fort Worth metropolitan area in Texas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8db5b6c8190984b61f91981f575 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6387442588190a2cdae60a6a940d6 completed April 20, 2026, 2:30 p.m.
Created at: April 10, 2026, 1:41 p.m.