Triple
T19540287
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Samanalawewa Reservoir |
E488879
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object | Ceylon Electricity Board |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ceylon Electricity Board | Statement: [Samanalawewa Reservoir, operator, Ceylon Electricity Board]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ceylon Electricity Board Context triple: [Samanalawewa Reservoir, operator, Ceylon Electricity Board]
-
A.
Tamil Nadu Generation and Distribution Corporation Limited
Tamil Nadu Generation and Distribution Corporation Limited is the state-owned utility responsible for electricity generation and distribution across the Indian state of Tamil Nadu.
-
B.
Tamil Nadu Transmission Corporation Limited
Tamil Nadu Transmission Corporation Limited is the state-owned utility responsible for operating and maintaining the high-voltage electricity transmission network in Tamil Nadu, India.
-
C.
National Power Corporation
The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
-
D.
North South Power Company Limited
North South Power Company Limited is a Nigerian private power generation company best known for managing and operating major hydroelectric assets such as the Shiroro Hydroelectric Power Station.
-
E.
Taiwan Power Company
Taiwan Power Company is Taiwan’s state-owned electric power utility responsible for generating, transmitting, and distributing electricity across the island.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ceylon Electricity Board Target entity description: The Ceylon Electricity Board is Sri Lanka’s state-owned utility responsible for electricity generation, transmission, and distribution across the country.
-
A.
Tamil Nadu Generation and Distribution Corporation Limited
Tamil Nadu Generation and Distribution Corporation Limited is the state-owned utility responsible for electricity generation and distribution across the Indian state of Tamil Nadu.
-
B.
Tamil Nadu Transmission Corporation Limited
Tamil Nadu Transmission Corporation Limited is the state-owned utility responsible for operating and maintaining the high-voltage electricity transmission network in Tamil Nadu, India.
-
C.
National Power Corporation
The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
-
D.
North South Power Company Limited
North South Power Company Limited is a Nigerian private power generation company best known for managing and operating major hydroelectric assets such as the Shiroro Hydroelectric Power Station.
-
E.
Taiwan Power Company
Taiwan Power Company is Taiwan’s state-owned electric power utility responsible for generating, transmitting, and distributing electricity across the island.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8db5b6c8190984b61f91981f575 |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63871d00881909ed7371ae5577957 |
completed | April 20, 2026, 2:30 p.m. |
Created at: April 10, 2026, 1:41 p.m.