Triple

T19540284
Position Surface form Disambiguated ID Type / Status
Subject Samanalawewa Reservoir E488879 entity
Predicate partOf P40 FINISHED
Object Samanalawewa Hydroelectric Scheme NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Samanalawewa Hydroelectric Scheme | Statement: [Samanalawewa Reservoir, partOf, Samanalawewa Hydroelectric Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Samanalawewa Hydroelectric Scheme
Context triple: [Samanalawewa Reservoir, partOf, Samanalawewa Hydroelectric Scheme]
  • A. Tuirial Hydroelectric Project
    Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
  • B. Idamalayar Hydroelectric Project
    Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Agus River hydropower complex
    The Agus River hydropower complex is a major series of hydroelectric power plants and related infrastructure along the Agus River in Mindanao, Philippines, that supplies a significant portion of the island’s electricity.
  • E. Gordon–Pedder hydroelectric scheme
    The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Samanalawewa Hydroelectric Scheme
Target entity description: The Samanalawewa Hydroelectric Scheme is a major hydroelectric power project in Sri Lanka that uses the Samanalawewa Reservoir to generate electricity for the national grid.
  • A. Tuirial Hydroelectric Project
    Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
  • B. Idamalayar Hydroelectric Project
    Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Agus River hydropower complex
    The Agus River hydropower complex is a major series of hydroelectric power plants and related infrastructure along the Agus River in Mindanao, Philippines, that supplies a significant portion of the island’s electricity.
  • E. Gordon–Pedder hydroelectric scheme
    The Gordon–Pedder hydroelectric scheme is a major Tasmanian power project that harnesses water from Lake Pedder and surrounding catchments to generate hydroelectricity for the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8db5b6c8190984b61f91981f575 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63871d00881909ed7371ae5577957 completed April 20, 2026, 2:30 p.m.
Created at: April 10, 2026, 1:41 p.m.