Triple
T19539530
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Roundhouse Park |
E488857
|
entity |
| Predicate | adjacentTo |
P224
|
FINISHED |
| Object | Lower Simcoe Street |
—
|
NE NERFINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lower Simcoe Street Context triple: [Roundhouse Park, adjacentTo, Lower Simcoe Street]
-
A.
Simcoe Street
chosen
Simcoe Street is a downtown Toronto thoroughfare that runs through the city’s Entertainment District, connecting major cultural, commercial, and civic landmarks.
-
B.
Dundas Street
Dundas Street is a major east–west thoroughfare in Toronto, Ontario, known for connecting diverse neighborhoods and serving as a key commercial and cultural corridor in the city.
-
C.
Dundas Street
Dundas Street is a major Georgian-era thoroughfare in Edinburgh, Scotland, known for its elegant architecture and role as a key route through the New Town.
-
D.
Main Street Schomberg
Main Street Schomberg is the historic village core of Schomberg, Ontario, known for its preserved heritage buildings, small-town streetscape, and local shops and events.
-
E.
King Street East
King Street East is a major thoroughfare in downtown Toronto known for its historic architecture, cultural venues, and proximity to the city’s theatre and entertainment districts.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69d8e8db5b6c8190984b61f91981f575 |
elicitation | completed |
| NER | batch_69e63871d00881909ed7371ae5577957 |
ner | completed |
Created at: April 10, 2026, 1:41 p.m.