Triple

T19531579
Position Surface form Disambiguated ID Type / Status
Subject Rollins Pass route over the Continental Divide E488668 entity
Predicate instanceOf P0 FINISHED
Object mountain pass railroad route C1084 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mountain pass railroad route
Context triple: [Rollins Pass route over the Continental Divide, instanceOf, mountain pass railroad route]
  • A. mountain pass chosen
    A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
  • B. mountain pass lookout
    A mountain pass lookout is a vantage point, often at a high saddle between peaks, designed for observing and monitoring the surrounding terrain, weather, and travel routes through the pass.
  • C. mountain rack railway
    A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
  • D. U.S. Bicycle Route
    A U.S. Bicycle Route is a nationally designated, numbered cycling corridor that connects states, regions, and key destinations across the United States using a mix of on-road and off-road facilities.
  • E. mountain trail
    A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8db5b6c8190984b61f91981f575 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:41 p.m.