Triple

T19521722
Position Surface form Disambiguated ID Type / Status
Subject Bronson Gate E488415 entity
Predicate instanceOf P0 FINISHED
Object studio gate C42117 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: studio gate
Context triple: [Bronson Gate, instanceOf, studio gate]
  • A. startup studio
    A startup studio is an organization that systematically builds multiple startups in-house by generating ideas, assembling founding teams, and providing shared resources, capital, and operational support.
  • B. Japanese gate
    A Japanese gate is a traditional architectural structure, often called a torii or mon, that marks the entrance to a sacred or significant space and symbolically separates the mundane world from the spiritual or special area beyond.
  • C. studio tour
    A studio tour is a guided visit through a working creative space—such as a film, music, art, or design studio—where visitors can observe the production process, equipment, and environment behind the finished work.
  • D. Stiftung
    Eine Stiftung ist eine rechtlich verselbstständigte Vermögensmasse, die dauerhaft einem vom Stifter festgelegten, meist gemeinnützigen Zweck dient und von einem dafür eingerichteten Organ verwaltet wird.
  • E. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8da8bec819081f400199491ccc3 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:40 p.m.