Triple

T19506286
Position Surface form Disambiguated ID Type / Status
Subject DN73 E488029 entity
Predicate hasTouristAttractionsAlong P55845 FINISHED
Object Rucăr-Bran corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rucăr-Bran corridor | Statement: [DN73, hasTouristAttractionsAlong, Rucăr-Bran corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rucăr-Bran corridor
Context triple: [DN73, hasTouristAttractionsAlong, Rucăr-Bran corridor]
  • A. Timiș-Cerna Corridor
    The Timiș-Cerna Corridor is a mountain pass and natural corridor in southwestern Romania that separates major massifs of the Southern Carpathians and serves as an important route between the Banat and Oltenia regions.
  • B. Bucharest–Pitești–western Romania corridor
    The Bucharest–Pitești–western Romania corridor is a major transport axis linking Romania’s capital with Pitești and further westward, serving as a key route for national and international road traffic.
  • C. Transfăgărășan road
    The Transfăgărășan road is a famous high-altitude mountain highway in Romania, renowned for its dramatic hairpin turns, tunnels, and scenic views through the Făgăraș Mountains.
  • D. Bucharest–Brașov railway
    The Bucharest–Brașov railway is a major Romanian rail corridor linking the capital Bucharest with the mountain city of Brașov through the scenic Prahova Valley.
  • E. Strada Buzești
    Strada Buzești is a major street in central Bucharest, Romania, connecting the Piața Victoriei area with the city’s northwestern districts and serving as an important traffic artery.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Rucăr-Bran corridor
Target entity description: The Rucăr-Bran corridor is a scenic mountain pass in Romania, renowned for its dramatic Carpathian landscapes, traditional villages, and popularity as a tourist route between Transylvania and Wallachia.
  • A. Timiș-Cerna Corridor
    The Timiș-Cerna Corridor is a mountain pass and natural corridor in southwestern Romania that separates major massifs of the Southern Carpathians and serves as an important route between the Banat and Oltenia regions.
  • B. Bucharest–Pitești–western Romania corridor
    The Bucharest–Pitești–western Romania corridor is a major transport axis linking Romania’s capital with Pitești and further westward, serving as a key route for national and international road traffic.
  • C. Transfăgărășan road
    The Transfăgărășan road is a famous high-altitude mountain highway in Romania, renowned for its dramatic hairpin turns, tunnels, and scenic views through the Făgăraș Mountains.
  • D. Bucharest–Brașov railway
    The Bucharest–Brașov railway is a major Romanian rail corridor linking the capital Bucharest with the mountain city of Brașov through the scenic Prahova Valley.
  • E. Strada Buzești
    Strada Buzești is a major street in central Bucharest, Romania, connecting the Piața Victoriei area with the city’s northwestern districts and serving as an important traffic artery.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d9d1c88190b01cd78b8be49384 completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63511fc688190bd1474406060fa1b completed April 20, 2026, 2:15 p.m.
Created at: April 10, 2026, 1:40 p.m.