Triple

T19478411
Position Surface form Disambiguated ID Type / Status
Subject Eisenhower Memorial Bore E487313 entity
Predicate elevationAtEastPortal P136079 FINISHED
Object approximately 11,013 feet LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 11,013 feet | Statement: [Eisenhower Memorial Bore, elevationAtEastPortal, approximately 11,013 feet]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: elevationAtEastPortal
Context triple: [Eisenhower Memorial Bore, elevationAtEastPortal, approximately 11,013 feet]
  • A. elevationAtBase
    Indicates the height or altitude measured at the base or lowest point of an object or feature relative to a reference level.
  • B. elevationApproxMeters
    Indicates the approximate elevation of an entity above sea level, measured in meters.
  • C. elevationRelativeToCanyonFloor
    Indicates the vertical height or altitude of something measured relative to the canyon floor as the reference level.
  • D. upperStationElevation
    Indicates the elevation or height above a reference level (e.g., sea level) of the upper station in a system or structure.
  • E. damCrestElevation
    Indicates the height of the top (crest) of a dam above a specified reference level, typically sea level.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63437b9748190a8fc6bf6b3d90918 completed April 20, 2026, 2:12 p.m.
PD Predicate disambiguation batch_69e4fd7883308190b73912a71a35a835 completed April 19, 2026, 4:06 p.m.
PDg Predicate description generation batch_69e5004d3a708190a1c13c8f644f3926 completed April 19, 2026, 4:18 p.m.
Created at: April 10, 2026, 1:39 p.m.